{"id":10085,"date":"2026-01-24T09:45:23","date_gmt":"2026-01-24T09:45:23","guid":{"rendered":"https:\/\/zda.org.zm\/vs\/izic\/?page_id=10085"},"modified":"2026-01-24T09:47:51","modified_gmt":"2026-01-24T09:47:51","slug":"landless-corner-to-mazabuka-highway-development-project-lusaka-and-kafue-bypass","status":"publish","type":"page","link":"https:\/\/zda.org.zm\/izic\/landless-corner-to-mazabuka-highway-development-project-lusaka-and-kafue-bypass\/","title":{"rendered":"Landless Corner to Mazabuka Highway Development Project (Lusaka and Kafue Bypass)"},"content":{"rendered":"<body>\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"10085\" class=\"elementor elementor-10085\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4e879096 e-flex e-con-boxed e-con e-parent\" data-id=\"4e879096\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f8c8f33 elementor-widget elementor-widget-heading\" data-id=\"f8c8f33\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Project Details<\/h2>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-01a0707 e-flex e-con-boxed e-con e-parent\" data-id=\"01a0707\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-01eb431 e-con-full e-flex e-con e-child\" data-id=\"01eb431\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3d3d4b08 elementor-widget__width-initial elementor-widget elementor-widget-text-editor\" data-id=\"3d3d4b08\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<figure class=\"wp-block-table\">\n<table>\n<tbody>\n<tr>\n<td><strong>Project Title<\/strong><\/td>\n<td><strong>Landless Corner to Mazabuka Highway Development Project (Lusaka and Kafue Bypass)<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Project Description<\/td>\n<td>The Government of the Republic of Zambia, through its Road Development Agency (RDA), proposes the construction of a new strategic highway spanning approximately 143 kilometers. The route will connect Landless Corner in Central Province to Mazabuka in Southern Province and pass through Lusaka Province via a carefully planned bypass corridor. The planned infrastructure includes a dual-lane asphalt concrete road in both directions with a total pavement width of 9 meters. The design incorporates a new bridge crossing the Kafue River, as well as associated structures including culverts, toll plazas, a weighbridge, street lighting, safety signage, and drainage systems. The bypass alignment has been deliberately selected to avoid the central urban area of Lusaka. Once completed, the project will significantly decongest the capital city, facilitate regional transport, improve trade logistics, and enhance socio-economic development in the surrounding provinces.<\/td>\n<\/tr>\n<tr>\n<td>Project Location<\/td>\n<td>Chibompo \u2013 Mazabuka Districts<\/td>\n<\/tr>\n<tr>\n<td>Lead Agency\/Project Promoter<\/td>\n<td>Ministry of Infrastructure, Housing and Urban Development<\/td>\n<\/tr>\n<tr>\n<td>Type of investment<\/td>\n<td>FDI, LDI<\/td>\n<\/tr>\n<tr>\n<td>Model of engagement<\/td>\n<td>Investment into Fund Structure<\/td>\n<\/tr>\n<tr>\n<td>Project Cost<\/td>\n<td>USD 215 million<\/td>\n<\/tr>\n<tr>\n<td>Project Status<\/td>\n<td>Green Field Project \u2013 Feasibility study<\/td>\n<\/tr>\n<tr>\n<td>Project Sector<\/td>\n<td>Infrastructure<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n\t\t<\/div>\n\t\t<\/div><\/div><\/div><\/div><\/body>","protected":false},"excerpt":{"rendered":"<p>Project Details Project Title Landless Corner to Mazabuka Highway Development Project (Lusaka and Kafue Bypass) Project Description The Government of the Republic of Zambia, through its Road Development Agency (RDA), proposes the construction of a new strategic highway spanning approximately 143 kilometers. The route will connect Landless Corner in Central Province to Mazabuka in Southern [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"om_disable_all_campaigns":false,"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-10085","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/pages\/10085","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/comments?post=10085"}],"version-history":[{"count":5,"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/pages\/10085\/revisions"}],"predecessor-version":[{"id":10097,"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/pages\/10085\/revisions\/10097"}],"wp:attachment":[{"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/media?parent=10085"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}