{"id":9977,"date":"2026-01-24T06:11:22","date_gmt":"2026-01-24T06:11:22","guid":{"rendered":"https:\/\/zda.org.zm\/vs\/izic\/?page_id=9977"},"modified":"2026-01-24T06:24:45","modified_gmt":"2026-01-24T06:24:45","slug":"lufubu-power-company-limited-lufubu-hydropower-project","status":"publish","type":"page","link":"https:\/\/zda.org.zm\/izic\/lufubu-power-company-limited-lufubu-hydropower-project\/","title":{"rendered":"Lufubu Power Company Limited (Lufubu Hydropower Project)"},"content":{"rendered":"<body>\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"9977\" class=\"elementor elementor-9977\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2e015d7 e-flex e-con-boxed e-con e-parent\" data-id=\"2e015d7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-24e0585 e-con-full e-flex e-con e-child\" data-id=\"24e0585\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-252f0fe elementor-widget elementor-widget-heading\" data-id=\"252f0fe\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Project Details<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3a0fbd1e elementor-widget elementor-widget-text-editor\" data-id=\"3a0fbd1e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<figure class=\"wp-block-table\">\n<table>\n<tbody>\n<tr>\n<td><strong>Project Title<\/strong><\/td>\n<td><strong>Lufubu Power Company Limited (Lufubu Hydropower Project)<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Project Description<\/td>\n<td>Zambia offers an FDI opportunity in the 163 MW Lufubu Hydropower Cascade (3 plants) on the Lufubu River, Northern Province. The US$700M project will deliver stable, high-rainfall\u2013driven generation, strengthening the national grid and supporting regional tourism and investment growth. With projected EBITDA of US$118.4M in Year 1 and a strong long-term market, Lufubu Power Company seeks a minority equity or loan partner for the 4-year construction and development program.<\/td>\n<\/tr>\n<tr>\n<td>Project Location<\/td>\n<td>Mpulungu and Nsama District of Northern Province of Zambia<\/td>\n<\/tr>\n<tr>\n<td>Lead Agency\/Project Promoter<\/td>\n<td>Lufubu Power Company Limited<\/td>\n<\/tr>\n<tr>\n<td>Type of investment<\/td>\n<td>FDI, LDI<\/td>\n<\/tr>\n<tr>\n<td>Model of engagement<\/td>\n<td>Investment into Fund Structure<\/td>\n<\/tr>\n<tr>\n<td>Project Cost<\/td>\n<td>US $700 million<\/td>\n<\/tr>\n<tr>\n<td>Project Status<\/td>\n<td>Green Field Project \u2013 feasibility study, EIA, GID<\/td>\n<\/tr>\n<tr>\n<td>Project Sector<\/td>\n<td>Energy (Production, transmission, and distribution of electricity)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n\n<p class=\"wp-block-paragraph\">\u00a0<\/p>\n\t\t<\/div>\n\t\t<\/div><\/div><\/div><\/div><\/body>","protected":false},"excerpt":{"rendered":"<p>Project Details Project Title Lufubu Power Company Limited (Lufubu Hydropower Project) Project Description Zambia offers an FDI opportunity in the 163 MW Lufubu Hydropower Cascade (3 plants) on the Lufubu River, Northern Province. The US$700M project will deliver stable, high-rainfall\u2013driven generation, strengthening the national grid and supporting regional tourism and investment growth. With projected EBITDA [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"om_disable_all_campaigns":false,"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-9977","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/pages\/9977","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/comments?post=9977"}],"version-history":[{"count":5,"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/pages\/9977\/revisions"}],"predecessor-version":[{"id":10019,"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/pages\/9977\/revisions\/10019"}],"wp:attachment":[{"href":"https:\/\/zda.org.zm\/izic\/wp-json\/wp\/v2\/media?parent=9977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}